Midvale City 2019 Roadway Improvement Project

Midvale City 2019 Roadway Improvement Project

09/26/2019

09/26/19: These are some pictures of the project during construction! We are almost 100% complete and we would like to Thank all the residents for their patience and hospitality during this project!

 

This project will impact 4 Midvale City Streets to include 7800 South from 1000 East to 1200 East, 300 East off of  7800 South, Center Square and Grant Street. This project will be completed by September 27, 2019.

*Please see street details below*

For any questions or concerns please contact Miller Paving, Inc.

801-262-5922

7800 South, Midvale, UT, USA

Midvale City 2019 Roadway Improvement Project - 7800 South (1000 E. to 1200 E.)

08/24/2019

Dear Residence of 7800 South from 1000 East to 1200 East

Starting the week of Sept. 3rd, 2019 Miller Paving, Inc. will be starting the 2019 Midvale City Road Improvements Project which will include installing new waterways, curb & gutter, sidewalk, drive approaches and new asphalt pavement which will include some road excavation, grade work and milling. Our plan is to start at 7800 S. and 1000 E. and work our way East Bound to 1200 E (North side of the street). During this time, we will try and minimize the restrictions to residence to include access to their driveways and sidewalks along with limited parking on 7800 South. During the construction process the middle lane will be used for West Bound traffic. During Business hours you will not be able to park on the street in front of homes, and if your drive approach is being impacted by the new construction please plan on a minimum of 7 days for concrete to cure before you will have access to your driveway. Although the construction work will not start until Sept. 3rd, 2019 we will start relocating some fencing on August 26th, 2019. We work hard at ensuring the construction area is always as picked up as possible and always have safety as a top priority. We would appreciate the neighborhoods help to ensure the safety of all residence. If there are any special needs request, please contact us to make arrangements. On behalf of Miller Paving, Inc. we would like to apologize for any inconvenience this may cause you.

Please visit our website: www.millerpaving.com for construction updates.

*If you know where your sprinklers lines are, we would appreciate you marking them*

If you have any questions, please contact the project supervisor listed below.

Thank you in advance for your consideration.

Sincerely,

MILLER PAVING, INC.

PROJECT SUPERVISOR: Bruce Cunningham

PHONE: 801-403-8544

PROJECT START DATE: 09/03/19

PROPOSED PROJECT COMPLETION: 10/04/19

P.O. BOX 571039 / MURRAY, UTAH 84157-1039 / 801.262.5922 / FAX 801.262.5974

5640 SOUTH RILEY LANE / MURRAY, UTAH 84107-1557

7800 South 1000 East, Sandy, UT, USA

Midvale City 2019 Roadway Improvement Project - 7800 South 300 East

08/08/2019

Update: 08/23/19

Dear Residents of 300 East

This section of the project is now complete. We here at Miller Paving, Inc. want to Thank You for your patience and cooperation during the construction process. We hope you are happy with your new construction. If you have any questions or concerns please give us a call!

Sincerely,

Miller Paving, Inc.

 

 

Update: 08/08/19

Dear Residents of 300 East

We here at Miller Paving, Inc. would like to Thank all residents for their patience during this construction process. The good news is that we are getting close to being finished on your street! We will start to Mill and Pave the road next week along with completing some final touch ups.

Starting Tuesday August 13, 2019 at 7am we will start by milling the entire road this will then be followed by asphalt paving of the entire road. We plan to have this completed by Thursday August 15, 2019 at 6pm. ***DURING THIS TIME WE MUST ENFORCE NO PARKING ON THE STREET AT ANY TIME FROM TUESDAY AUGUST 13TH @ 7AM TO THURSDAY AUGUST 15TH @ 6PM***

**Vehicles parked on the street during this time will be towed at Owners expense**

 

Dear Residents of 300 East

Miller Paving, Inc. will be starting the 2019 Midvale City Road Improvements Project which will impact 300 East Residents. We will be starting this project on July 26th, 2019 and expect the project to be completed by August 20th, 2019.

During this time, we will try and minimize the restrictions to residents to include access to their driveways and sidewalks along with limited parking on the street.  Beginning July 26th, we will be starting on the East side and replacing the 4 corners, during this time we will also be working on the storm drain and inlets on the west side.  Starting on August 1st we will then be moving onto the West side Curb and Gutter and Drive Approaches. We work hard at ensuring the construction area is always as picked up as possible and always have safety as a top priority. We would appreciate the neighborhoods help to ensure the safety of all residence. If there are any special needs request, please contact us to make arrangements. On behalf of Miller Paving, Inc. we would like to apologize for any inconvenience this may cause you.

*If you know where your sprinkler lines run by the street please mark them out or let us know. During the construction period we will need you to contain your sprinklers and avoid watering in the work area.*

 

If you have any questions, please contact the project supervisor listed below.

Thank you in advance for your consideration.

Sincerely,

MILLER PAVING, INC.

PROJECT SUPERVISOR: Bruce Cunningham

PHONE: 801-403-8544

PROJECT START DATE: 07/26/19

 

 

300 East 7800 South, Midvale, UT, USA

Midvale City 2019 Roadway Improvement Project - Center Square

07/25/2019

Update: 08/02/19

Dear Residents of Center Square

This section of the project is now complete. We here at Miller Paving, Inc. want to Thank You for your patience and cooperation during the construction process. We hope you are happy with your new construction. If you have any questions or concerns please give us a call!

Sincerely,

Miller Paving, Inc.

  • Update: 07/25/19

Dear Residents of Center Square

Miller Paving, Inc. would like to Thank all residents for their patience during this construction process. The good news is that we are getting close to being finished on your street! We will start to Mill and Pave the road next week along with completing some final touch ups.

Starting Wednesday July 31, 2019 at 7am we will start by milling the entire road this will then be followed by asphalt paving of the entire road. We plan to have this completed by Friday August 2, 2019 at 5pm. ***DURING THIS TIME WE MUST ENFORCE NO PARKING ON THE STREET AT ANY TIME FROM WEDNESDAY JULY 31ST @ 7AM TO AUGUST 2ND @ 5PM***

**Vehicles parked on the street during this time will be towed at Owners expense**

If you have any questions, please contact the project supervisor listed below.

Thank you in advance for your consideration.

Sincerely,

MILLER PAVING, INC.

PROJECT SUPERVISOR: Bruce Cunningham

PHONE: 801-403-8544

 

Dear Residents of Center Square

Starting July 8th, 2019 Miller Paving, Inc. will be starting the 2019 Midvale City Road Improvements Project which will include installing new waterways, curb & gutter, and new asphalt pavement along the entire roadway. During this time, we will try and minimize the restrictions to residence to include access to their driveways and sidewalks along with limited parking on Center Square. Although we will have to enforce NO parking on the East side along the fence line during the length of the project. To minimize the lane restrictions, we plan on removing the waterway in 2 phases this will allow for limited parking for surrounding businesses. We work hard at ensuring the construction area is always as picked up as possible and always have safety as a top priority. We would appreciate the neighborhoods help to ensure the safety of all residence. If there are any special needs request, please contact us to make arrangements. On behalf of Miller Paving, Inc. we would like to apologize for any inconvenience this may cause you.

 

If you have any questions, please contact the project supervisor listed below.

Thank you in advance for your consideration.

Sincerely,

MILLER PAVING, INC.

PROJECT SUPERVISOR: Bruce Cunningham

PHONE: 801-403-8544

PROJECT START DATE: 07/08/19

P.O. BOX 571039 / MURRAY, UTAH 84157-1039 / 801.262.5922 / FAX 801.262.5974

5640 SOUTH RILEY LANE / MURRAY, UTAH 84107-1557

 

South Grant Street, Midvale, UT, USA

Midvale City 2019 Roadway Improvement Project - Grant Street

07/25/2019

Update: 08/02/19

Dear Residents of Grant Street

This section of the project is now complete. We here at Miller Paving, Inc. want to Thank You for your patience and cooperation during the construction process. We hope you are happy with your new construction. If you have any questions or concerns please give us a call!

Sincerely,

Miller Paving, Inc.

 

UPDATE: 07/25/19

Dear Residents of Grant Street

We here at Miller Paving would like to Thank all residents for their patience during this construction process. The good news is that we are getting close to being finished on your street! We will start to Mill and Pave the road next week along with completing some final touch ups.

Starting Wednesday July 31, 2019 at 7am we will start by milling the entire road this will then be followed by asphalt paving of the entire road. We plan to have this completed by Friday August 2, 2019 at 5pm. ***DURING THIS TIME WE MUST ENFORCE NO PARKING ON THE STREET AT ANY TIME FROM WEDNESDAY JULY 31ST @ 7AM TO AUGUST 2ND @ 5PM***

**Vehicles parked on the street during this time will be towed at Owners expense**

If you have any questions, please contact the project supervisor listed below.

Thank you in advance for your consideration.

Sincerely,

MILLER PAVING, INC.

PROJECT SUPERVISOR: Bruce Cunningham

PHONE: 801-403-8544

 

Dear Residents of Grant Street (07/12/19)

We plan to start the construction of the curb & gutter and waterway on 07/16/19. At this time we are still working with Blue Stakes to locate the gas and waterlines which may delay the schedule by a couple days.

The apartments on the East side of Grant street (7555 S.) will not have access to any of their parking for approximately 5 days once we start on the drive approaches and curbs.  The Grant Street Apartments (7528 S.) will not have access to their visitor parking spots as we complete the drive approaches and curbs for approximately 5 days as well. We will be placing signs in the area 24 hours in advance. During this time we ask residence of the apartments to please park on the street. We apologize for this inconvenience and ask the neighborhood to please be kind to each other during this time as we will be working diligently to get this done as quickly as possible. Thank you in advance for your patience.

Sincerely,

Miller Paving, Inc.

 

 

Dear Residents of Grant Street (07/03/19)

Starting the week of July 8th, 2019 Miller Paving, Inc. will be starting the 2019 Midvale City Road Improvements Project which will include installing new waterways, curb & gutter, sidewalk and new asphalt pavement which will include some road excavation, grade work and milling. During this time, we will try and minimize the restrictions to residence to include access to their driveways and sidewalks along with limited parking on Grant Street. We work hard at ensuring the construction area is always as picked up as possible and always have safety as a top priority. We would appreciate the neighborhoods help to ensure the safety of all residence. If there are any special needs request, please contact us to make arrangements. On behalf of Miller Paving, Inc. we would like to apologize for any inconvenience this may cause you.

If you have any questions, please contact the project supervisor listed below.

Thank you in advance for your consideration.

Sincerely,

MILLER PAVING, INC.

PROJECT SUPERVISOR: Bruce Cunningham

PHONE: 801-403-8544

PROJECT START DATE: 07/08/19

P.O. BOX 571039 / MURRAY, UTAH 84157-1039 / 801.262.5922 / FAX 801.262.5974

5640 SOUTH RILEY LANE / MURRAY, UTAH 84107-1557

 

South Grant Street, Midvale, UT, USA